Flagstaff, AZ - Northern Arizona University in Flagstaff, Arizona recently celebrated the opening of their new $47-million, 77,000-square-foot Student-Athlete High Performance Center. Home to the NAU Lumberjacks men’s basketball team, the sports complex will cater to a mix of varsity and recreational sports, along with physical education programs.
Last December, the university ordered over 12,000 square feet of ULTIMA 3000™ gym floor covering for the new sports venue. The first-time COVERMASTER® customer chose the industry’s most versatile and durable gym floor protection and the most cost-effective option in gym floor tarps that meets ADA compliance.
The highly decorative gymnasium floor covering has a dual-sided anti-slip top surface that’s perfect for non-athletic events. From formal occasions to high-pedestrian traffic events, ULTIMA 3000™ gym floor covers are designed to protect any gym floor from unnecessary wear and tear throughout years of use.
Posted May 17, 2022